Project
Weld Items

Project Summary

Active Weld Qty
×
multiplies Project Summary & Schedule for the active weld
Total Weld Volume
-- in³
Total Weld Metal (Deposited)
-- lbs
Total Filler — Root Process
-- lbs
Total Filler — Fill Process
-- lbs
Labor Rate
$85/hr
Est. Total Hours
-- hrs
Est. Total Labor
--
Est. Total Material Cost
--
◆ Project Total Cost
--

Schedule Duration

Days ×1.00
Swing ×1.10
Nights ×1.20
Combined: -- hrs/day Wt. factor: -- Adj. hrs: --
Work Days
--
Work Weeks
--
Calendar Days
--
Wt. Factor = Σ(shift hrs × factor) ÷ total hrs/day  ■  Adj. Hrs = Total Hrs × Wt. Factor  ■  Work Days = Adj. Hrs ÷ Manpower ÷ Hrs/Day
Settings saved to browser!

◆ Application Code

ASME B31.1
Power Piping
2024 Edition
ASME B31.3
Process Piping
2024 Edition
ASME SEC I
Power Boilers
2025 Edition
ASME SEC VIII
Pressure Vessels
2025 Div.1
AWS D1.1
Structural Steel
2020 Edition
NBIC NB-23
R-Stamp Repair
2023 Edition
General
No Application Code
ASME IX qual. only
No application code — ASME BPVC Section IX qualification rules apply. Use for structural fab, shop work, R-stamp repair, or any work not governed by a specific piping code.

◈ Project Defaults

Applied to all new projects
% of weld metal assigned to root
Used for new groove welds
Gap at root face between members
Unbeveled land at root of groove
% of total hrs actually welding. Field pipe = 10–20%, fab shop = 25–40%

△ Butt Joint Production Adder

Default production rates for butt joint connection types (min/ft). When a CJP/Backup chip is selected in the calculator, this rate is added to the estimated total time.
min/ft
CJP one side, no backing
min/ft
CJP welded both sides
min/ft
CJP with permanent backing

⚡ Welding Process Defaults

⌕ Filler Metal Lookup

✓ Applied!
Spec
AWS Classification
Material / Type
Polarity
Coating
Shielding Gas
Recommended Flow Rate
Positions
Dep. Efficiency
Arc-On Factor
Dep. Rate (arc-on, lbs/hr)
Note
▮ Saved Projects
Snapshots are saved to this browser. Click ◉ Open Comparison to open a side panel. Multiple comparisons stack left to right.

≡ WPS Library

Delete this WPS?
Select a WPS from the list
or click + New WPS to create one

⎙ Generate WPS PDF

Select Form Standard
ASME QW-482
Section IX Welding Procedure Specification format. P-No./Group, F-No., SFA classification, ASME essential variable coverage.
AWS D1.1
Structural Welding Code WPS format. F-No., A-No., electrode classification, preheat/interpass, technique requirements.